Bollard Installation Guide: 5 Key Points Before Construction

·By PROCOLUM Engineering
Bollard Installation Guide: 5 Key Points Before Construction

1. Foundation: The Bedrock

Concrete grade C25 minimum. Foundation pit dimensions based on column diameter and embedment depth. Ensure level pit bottom — add crushed stone bedding if needed. Cure for at least 7 days before installation. Waterproof foundation perimeter in high groundwater areas.

2. Drainage: Water Is Enemy #1

Reserve drainage outlet at cylinder bottom, connect via PVC pipe to drainage well with 1% minimum slope. Install infiltration well if no municipal drainage. Always perform water-filling test before backfilling.

3. Electrical: Safety Is Non-Negotiable

Use waterproof-rated cable (YJV or YJV22 armored), inside galvanized steel conduit, buried 500mm+ deep. Install leakage protection breaker (30mA or less) and independent breaker per circuit. Use three-phase distribution for 10+ bollard projects.

4. Spacing: Blocking vs. Passage

Standard column center spacing: 1.2-1.5m, clear gap 1.0-1.3m — blocks sedans and SUVs while allowing pedestrian flow. Fire lanes need 4m+ width with synchronized multi-bollard design for emergency lowering.

5. System Integration

Place control cabinet near security booth. Integrate with license plate recognition via dry contact/RS485, fire alarms for auto-lower, and CCTV for event-triggered camera feeds. Ethernet or 4G module required for cloud platform remote management.

Need a Professional Security Solution?

Our engineering team is ready to provide expert consultation and custom solutions

Whether you need vehicle access control for government compounds, perimeter security for military bases, or pedestrian-vehicle separation for commercial plazas, our engineering team provides free one-on-one solution design and product selection advice based on your site conditions and security requirements. Contact us via online form, phone, or WhatsApp.

Contact Us
Chat with us